FIDAEL TOOL: Login | Register

LPS as Per IEC 62305

Installation, Testing And Commissioning

Fidael Power Solutions' ITC services ensure that the carefully designed LPS and Earthing systems are implemented correctly, tested thoroughly, and handed over professionally. Key advantages for the customer include assurance of a functional and compliant safety system, professional project management, use of appropriate techniques (including maintenance-free options), comprehensive documentation (including vital As-builts and Test Certificates), and clear guidance for future upkeep. This provides peace of mind that the investment in safety infrastructure performs as intended.

Importance of Professional Installation, Testing, and Commissioning

While a good design is essential, it's the quality of the installation, thoroughness of testing, and proper commissioning that ultimately determine if an LPS and Earthing system will function correctly and safely when needed. Incorrect installation can render even the best design ineffective or unsafe. Testing verifies that the installation meets the design specifications and required performance standards. Commissioning ensures the system is fully operational and formally handed over.

What Service do we offer?

INSTALLATION, TESTING AND COMMISSIONING

  • Installation of External Lightning protection system and its required earthing system.
  • Arrangement for necessary tools and equipment and Manpower for installation
  • Laying of Earthing conductor in Grid or ring
  • Boring for earthing pits and installation of Vertical earth rods and its interconnection with earth mesh – Installation of complete maintenance free earthing system
  • Installation of Earth inspection chambers for inspection and maintenance purpose.
  • ITC of Structural lightning protection system and Integral Earthing system
  • Preparation of As-built drawings.
  • Documentation by preparing JMS, system approvals, Drawings and other required documents and submission of the same.
  • Explanation of the installation and providing guidelines to customer
  • Preparation of the complete report and submission along with required TC and other document.

The services will be provided only if the Fidael range of products are used

Book an appointment

ADVANTAGES

  • The customer receives the tangible safety systems as per the engineered design, physically implemented on their site by professionals.
  • Ensures the installation is performed efficiently, safely, and correctly using the right resources. Relieves the customer from managing these logistical aspects and guarantees a professional approach.
  • Ensures this critical component is installed precisely according to the design, maximizing the earthing system's effectiveness and safety performance.
  • Provides robust connection to earth. The focus on "maintenance-free" offers the customer reduced long-term operating costs, enhanced reliability, and less need for periodic interventions compared to traditional systems.
  • Facilitates easy, accurate, and cost-effective long-term maintenance and verification of the earthing system's performance, ensuring continued compliance and safety.
  • Demonstrates expertise in modern, integrated protection methods. Customers with suitable building designs benefit from potentially more aesthetic and cost-effective systems, correctly installed and verified by Fidael.
  • Provides the customer with an exact record of their installed safety infrastructure, invaluable for future reference, modifications, and compliance checks.
  • Ensures the project is managed professionally and safely, with all necessary paperwork handled correctly. Reduces the administrative burden on the customer and provides a clear audit trail.
  • Empowers the customer with knowledge about their critical safety systems, promoting understanding and ensuring they are aware of how to maintain the system's effectiveness over time.
  • Delivers a comprehensive handover package to the customer, providing documented evidence of a successful installation, verified performance (through testing results), and compliance with standards. This formally closes out the project and assures quality.

2024 All Rights Reserved | Privacy Policy